Cutter Ferry Footbridge

Cutter Ferry Footbridge was closed on the 5th of November due toa structural fault, inconveniencing the many people who use it forsafe, convenient and pleasant access to the centre of Cambridge.The Co... continue reading »

950 signatures Goal: 1,000
All Signatures (950 total)
276.
J S 22 June 2014
277.
Tom D 21 June 2014

"Postcode cb13hr this bridge is sooo very useful"

278.
Charlotte G 20 June 2014
279.
Lisa B 20 June 2014
280.
Melanie Andnathanf 19 June 2014
281.
Andrew E 18 June 2014

"Postcode CB5 8HT This is a vital route across the river. Please reopen it as soon as possible"

282.
Clare M 18 June 2014
283.
Ian E 18 June 2014
284.
Colin M 17 June 2014
285.
Chris A 14 June 2014
286.
Patrick G 13 June 2014
287.
Ashley T 12 June 2014
288.
Dr Dapingc 11 June 2014
289.
Jim G 9 June 2014
290.
G Fb 6 June 2014

"Postcode PE28 3HA All rights of way should be kept open whether publicly or privately maintained."

291.
Brian M 5 June 2014
292.
Anna M 3 June 2014
293.
A L 2 June 2014
294.
Joshua G 30 May 2014
295.
Lisa M 29 May 2014
296.
Nicola R 27 May 2014
297.
Ken W 23 May 2014

"Postcode CB4 1BJ I use the bridge going to and from work every day and would like to see it opened again as soon as possible."

298.
Sarah B 21 May 2014
299.
Phil T 19 May 2014
300.
Sara G 17 May 2014
« 1 ... 10 11 12 13 14 ... 38 »