Cutter Ferry Footbridge

Cutter Ferry Footbridge was closed on the 5th of November due toa structural fault, inconveniencing the many people who use it forsafe, convenient and pleasant access to the centre of Cambridge.The Co... continue reading »

950 signatures Goal: 1,000
All Signatures (950 total)
26.
John K 18 September 2015
27.
Amanda M 17 September 2015
28.
Jennifer B 16 September 2015
29.
David H 14 September 2015
30.
George M 14 September 2015
31.
Bilen A 13 September 2015
32.
Sarah L 12 September 2015
33.
Laura K 11 September 2015
34.
Heidi T 5 September 2015
35.
Robin N 4 September 2015
36.
Lisbeth B 3 September 2015
37.
Walter R 2 September 2015
38.
Paul S 31 August 2015
39.
K E 30 August 2015
40.
Rm B 29 August 2015

"Postcode CB5 8DD repair or renew, but get on with it!"

41.
Derrik F 26 August 2015

"Postcode CB4 1JF The bridge is an important crossing point for local residents. Making a detour to the Fort St George bridge is an inconvenience for everyone, but particularly for children and those with mobility problems. I urge the council to repair th"

42.
Stein Mw 25 August 2015
43.
Celi Abbott 22 August 2015

"Postcode CB2 1RF PLEASE OPEN IT"

44.
Tim R 19 August 2015
45.
James H 19 August 2015
46.
Sam B 19 August 2015
47.
Annette W 18 August 2015

"Postcode CB4 1BJ Please open the bridge as soon as possible."

48.
Astrid A 18 August 2015
49.
Aran H 11 August 2015
50.
Paul F 8 August 2015
« 1 2 3 4 ... 38 »