Cutter Ferry Footbridge

Cutter Ferry Footbridge was closed on the 5th of November due toa structural fault, inconveniencing the many people who use it forsafe, convenient and pleasant access to the centre of Cambridge.The Co... continue reading »

950 signatures Goal: 1,000
All Signatures (950 total)
826.
Sarah S 31 October 2011
827.
Fred N 25 October 2011

"Postcode CB4 1QR I use this bridge,or use to use it, to walk into town. It provides me with exercise and a pleasent riverside walk. It stops traffic congestion and polution if I drive into town. The sooner a new bridge is provided the better."

828.
Bruce C 21 October 2011

"Postcode CB4 1BU it is a disgrace - if it had been a road bridge it would have been fixed by now."

829.
Robin O 21 October 2011
830.
Philip M 21 October 2011
831.
Nigel W 20 October 2011
832.
Letitia M 20 October 2011
833.
Stuart C 19 October 2011
834.
Mark O 18 October 2011

"Postcode CB4 1JP Give back our bridge!"

835.
Helen C 18 October 2011
836.
David J 16 October 2011
837.
Andy S 15 October 2011
838.
Ewan M 14 October 2011

"Postcode CB3 0HD It is ridiculous to think it would not be repaired"

839.
Alex C 14 October 2011
840.
Derek B 13 October 2011
841.
Franck A 13 October 2011

"Postcode CB1 2NE В"

842.
Fiona N 12 October 2011
843.
Meg H 9 October 2011
844.
Katie D 6 October 2011

"Postcode CB2 1TA I would be interested to know the nature of the failure (I'm studying structural engineering!)"

845.
Astrid Olinee 2 October 2011
846.
Tom R 29 September 2011
847.
G F 29 September 2011
848.
Pat L 26 September 2011

"Postcode CB5 8DJ The bridge is also needed to link town dwellers with the boathouse side of the river - a pressure which will increase in spring and summer."

849.
Jennifer H 25 September 2011
850.
John O 24 September 2011
« 1 ... 32 33 34 35 36 ... 38 »