scrap trident

I have read estimates of the cost of renewing Trident ranging from £20 billion to £120 billion. Either way, it is a waste of money. £4.7 billiion wouold save most of the 3000 people who die from malar... continue reading »

0 signatures Goal: 50
All Signatures (0 total)
1.
Thomas Lia 3 August 2011
2.
Andy Short 10 May 2011