Cutter Ferry Footbridge

Cutter Ferry Footbridge was closed on the 5th of November due toa structural fault, inconveniencing the many people who use it forsafe, convenient and pleasant access to the centre of Cambridge.The Co... continue reading »

950 signatures Goal: 1,000
All Signatures (950 total)
426.
Ben B 14 September 2013
427.
Robert W 11 September 2013
428.
Andreas Bondim 5 September 2013

"Postcode CB4 1HN Repairing this bridge is a very good investment. Money for this could possibly be raised by using fewer road cones at construction sites."

429.
John B 3 September 2013
430.
Dr Jos 3 September 2013
431.
C L 3 September 2013
432.
Phineas H 2 September 2013
433.
Rachel H 1 September 2013
434.
John M 29 August 2013

"Postcode CB2 1QJ Do something useful for locals rather than showy for tourists for a change."

435.
Frank K 28 August 2013
436.
Katherine S 26 August 2013
437.
Dr Rs 23 August 2013
438.
Rupert G 22 August 2013

"Postcode CB3 9EX В"

439.
Nigel S 21 August 2013
440.
Keri J 20 August 2013

"Postcode CB4 1DH this is getting ridiculous, I haven't seen any work at all taking place on the bridge. Could I please have an update as to what is going on?"

441.
Shanika N 19 August 2013
442.
Maddie J 18 August 2013
443.
Emma C 17 August 2013

"Postcode CB4 2HX Yet another walker/cyclist inconvenienced by the closure"

444.
Graham L 16 August 2013
445.
Sven B 15 August 2013
446.
Andrew O 13 August 2013

"Postcode CB1 3QF I'm helping with Strawberry Fair 2004 we need as much access to Midsummer common as possible."

447.
Julie S 6 August 2013

"Postcode cb4 1ju it makes a huge difference to my life that the bridge is closed."

448.
Tomasz S 5 August 2013
449.
Iain C 4 August 2013
450.
C H 1 August 2013
« 1 ... 16 17 18 19 20 ... 38 »