Cutter Ferry Footbridge

Cutter Ferry Footbridge was closed on the 5th of November due toa structural fault, inconveniencing the many people who use it forsafe, convenient and pleasant access to the centre of Cambridge.The Co... continue reading »

950 signatures Goal: 1,000
All Signatures (950 total)
476.
Geoff B 17 June 2013
477.
Polly S 15 June 2013
478.
Jesus Collegeboatc 14 June 2013

"Postcode CB4 What on earth is the matter with you people? Open the damn bridge and stop wasting my time and everyone else's on the river. You people make me sick!"

479.
Jim S 8 June 2013
480.
Shane B 8 June 2013

"Postcode CB! 9LY Go to... http://www.deiryassin.org"

481.
Seb W 7 June 2013
482.
David G 7 June 2013

"Postcode CB1 8PY I use this bridge every day"

483.
Tom K 7 June 2013
484.
Jim D 6 June 2013
485.
Fiona K 1 June 2013

"Postcode B13 8AG After a recent visit to Cambridge, I feel it would be disastrous for local residents and visiters if the bridge is permanently closed. The alternative road is noisy, dangerous and ugly."

486.
Stephen N 1 June 2013

"Postcode cb1 3lz We don't want 'side' walks when we got foot paths"

487.
Sarah W 1 June 2013
488.
Summer A 31 May 2013
489.
Tim B 29 May 2013
490.
Joshua A 25 May 2013
491.
Juliet E 25 May 2013
492.
Mavis B 23 May 2013
493.
Jeremy F 23 May 2013
494.
John K 23 May 2013
495.
Ian H 22 May 2013

"Postcode CB4 2ED I am very surprised to hear that the bridge is not due for urgent repair - this petition has my very strong support, as a frequent user of the bridge."

496.
Nick B 21 May 2013
497.
Phil R 14 May 2013
498.
Mark J 13 May 2013
499.
Sarah R 11 May 2013

"Postcode CB9 8DX An essential footbridge"

500.
Antony E 11 May 2013
« 1 ... 18 19 20 21 22 ... 38 »